Project Results

When an ECM or EBCx project concludes, energy savings is determined by applying the Measurement and Verification (M&V) Framework. The framework provides a standard for determining and reporting the impact of campus energy conservation projects. The M&V process compares measured performance data against a baseline to confirm that predicted energy savings actually occurred after implementation.

Please note the abbreviations used in the following table:

  • EBCx - Existing Building Commissioning
  • LTG - Lighting
  • VLV - Valve(s) replacement
Building Project Type Fiscal Year MMbtu Savings Fuel Cost Savings Percent Savings Reports
BMC: Belo Center for New Media EBCx 2015 3,865 $16,830 22.4%
GDC: Gates Dell Complex EBCx 2015 16,720 $72,431 30.8%
RLP: Patton Hall EBCx 2015 5,136 $23,597 20.2%  
BME: Biomedical Engineering Bldg. EBCx 2016 5,666 $24,597 8.8%  
CPE: Chemical and Petroleum Engineering VLV 2016 4,406 $20,097 6.2%  
FAC: Flawn Academic Center EBCx 2016 3,782 $15,951 14.2%  
PAC: Performing Arts Center LTG 2016 697 $2,858 1.5%  
TMM: Texas Memorial Museum LTG 2016 433 $1,725 10.6%  
UTA: UT Administration Bldg. EBCx 2016 4,419 $30,833 10.5%  
UTC: University Teaching Center VLV 2016 1,170 $6,134 10.0%
BMS: Blanton Museum Smith Bldg. EBCx 2017 1,097 $5,948 14.2%  
ECJ: Ernest Cockrell Jr. Hall EBCx 2017 7,371 $31,613 18.0%  
JGB: Jackson Geological Sciences Bldg. VLV 2017 834 $5,006 4.0%  
NEZ: North End Zone Bldg. EBCx 2017 14,379 $64,024 18.9%
PAC: Performing Arts Center EBCx 2017 9,938 $44,447 26.9%  
RSC: Recreational Sports Center EBCx 2017 6,103 $27,803 29.7%
ADH: Almetris Duren Residence Hall EBCx 2018 4,355 $19,394 21.8%  
CBA: College of Business Administration VLV 2018 4,556 $21,466 14.7%
DCP: Denton A. Cooley Pavilion EBCx 2018 474 $2,334 6.9%
GWB: Gordon-White Building Scheduling 2018 504 $2,155 7.0%
HRC: Harry Ransom Center LTG 2018 1,200 $4,922 2.4%  
LTD: Littlefield Dormitory EBCx 2018 1,747 $8,138 13.9%  
MBB: Moffett Molecular Biology Bldg. LTG 2018 189 $777 0.3%  
PCL: Perry-Castaneda Library LTG 2018 4,838 $19,849 6.9%  
WCP: William C. Powers Jr. SAC  EBCx 2018 3,324 $15,202 11.7%
SZB: George I. Sanchez Bldg. EBCx 2018 7,578 $37,225 25.2%
UTC: University Teaching Center EBCx 2018 1,296 $5,938 9.6%  
BUR: Burdine Hall EBCx 2019 795 $3,188 7.00%
CS5: Chilling Station No. 5 LTG 2019 224 $898 23.4%  
GEB: Dorothy L. Gebauer Building BAS Upgrade and Scheduling 2019 1,477 $6,706 39.0%
MNC: Moncrief-Neuhaus Athletic Center EBCx 2019 2,517 $10,624 12.6%