Project Results
When an ECM or EBCx project concludes, energy savings is determined by applying the Measurement and Verification (M&V) Framework. The framework provides a standard for determining and reporting the impact of campus energy conservation projects. The M&V process compares measured performance data against a baseline to confirm that predicted energy savings actually occurred after implementation.
Please note the abbreviations used in the following table:
- EBCx - Existing Building Commissioning
- LTG - Lighting
- VLV - Valve(s) replacement
Building | Project Type | Fiscal Year | MMbtu Savings | Fuel Cost Savings | Percent Savings | Reports |
---|---|---|---|---|---|---|
BMC: Belo Center for New Media | EBCx | 2015 | 3,865 | $16,830 | 22.4% | |
GDC: Gates Dell Complex | EBCx | 2015 | 16,720 | $72,431 | 30.8% | |
RLP: Patton Hall | EBCx | 2015 | 5,136 | $23,597 | 20.2% | |
BME: Biomedical Engineering Bldg. | EBCx | 2016 | 5,666 | $24,597 | 8.8% | |
CPE: Chemical and Petroleum Engineering | VLV | 2016 | 4,406 | $20,097 | 6.2% | |
FAC: Flawn Academic Center | EBCx | 2016 | 3,782 | $15,951 | 14.2% | |
PAC: Performing Arts Center | LTG | 2016 | 697 | $2,858 | 1.5% | |
TMM: Texas Memorial Museum | LTG | 2016 | 433 | $1,725 | 10.6% | |
UTA: UT Administration Bldg. | EBCx | 2016 | 4,419 | $30,833 | 10.5% | |
UTC: University Teaching Center | VLV | 2016 | 1,170 | $6,134 | 10.0% | |
BMS: Blanton Museum Smith Bldg. | EBCx | 2017 | 1,097 | $5,948 | 14.2% | |
ECJ: Ernest Cockrell Jr. Hall | EBCx | 2017 | 7,371 | $31,613 | 18.0% | |
JGB: Jackson Geological Sciences Bldg. | VLV | 2017 | 834 | $5,006 | 4.0% | |
NEZ: North End Zone Bldg. | EBCx | 2017 | 14,379 | $64,024 | 18.9% | |
PAC: Performing Arts Center | EBCx | 2017 | 9,938 | $44,447 | 26.9% | |
RSC: Recreational Sports Center | EBCx | 2017 | 6,103 | $27,803 | 29.7% | |
ADH: Almetris Duren Residence Hall | EBCx | 2018 | 4,355 | $19,394 | 21.8% | |
CBA: College of Business Administration | VLV | 2018 | 4,556 | $21,466 | 14.7% | |
DCP: Denton A. Cooley Pavilion | EBCx | 2018 | 474 | $2,334 | 6.9% | |
GWB: Gordon-White Building | Scheduling | 2018 | 504 | $2,155 | 7.0% | |
HRC: Harry Ransom Center | LTG | 2018 | 1,200 | $4,922 | 2.4% | |
LTD: Littlefield Dormitory | EBCx | 2018 | 1,747 | $8,138 | 13.9% | |
MBB: Moffett Molecular Biology Bldg. | LTG | 2018 | 189 | $777 | 0.3% | |
PCL: Perry-Castaneda Library | LTG | 2018 | 4,838 | $19,849 | 6.9% | |
WCP: William C. Powers Jr. SAC | EBCx | 2018 | 3,324 | $15,202 | 11.7% | |
SZB: George I. Sanchez Bldg. | EBCx | 2018 | 7,578 | $37,225 | 25.2% | |
UTC: University Teaching Center | EBCx | 2018 | 1,296 | $5,938 | 9.6% | |
BUR: Burdine Hall | EBCx | 2019 | 795 | $3,188 | 7.00% | |
CS5: Chilling Station No. 5 | LTG | 2019 | 224 | $898 | 23.4% | |
GEB: Dorothy L. Gebauer Building | BAS Upgrade and Scheduling | 2019 | 1,477 | $6,706 | 39.0% | |
MNC: Moncrief-Neuhaus Athletic Center | EBCx | 2019 | 2,517 | $10,624 | 12.6% |